💥 Gate Square Event: #PostToWinCC 💥
Post original content on Gate Square related to Canton Network (CC) or its ongoing campaigns for a chance to share 3,334 CC rewards!
📅 Event Period:
Nov 10, 2025, 10:00 – Nov 17, 2025, 16:00 (UTC)
📌 Related Campaigns:
Launchpool: https://www.gate.com/announcements/article/48098
CandyDrop: https://www.gate.com/announcements/article/48092
Earn: https://www.gate.com/announcements/article/48119
📌 How to Participate:
1️⃣ Post original content about Canton (CC) or its campaigns on Gate Square.
2️⃣ Content must be at least 80 words.
3️⃣ Add the hashtag #PostTo
The first assembly of the AG600 batch production has been delivered for test flight.
Jin10 data May 12 news, recently, the first aircraft of AG600 batch production (aircraft 1101) has completed total assembly and offline. Currently, the second aircraft of AG600 batch production (aircraft 1102) has completed the installation of major systems such as engine and landing gear, as well as insulation of the entire aircraft wiring harness, and is conducting avionics system testing work. The third aircraft of batch production (aircraft 1103) has also completed the connection of major components such as wings and vertical tail, entering the system installation phase.