Manned lunar flyby mission simulation canceled, launch postponed to March

NASA conducted a comprehensive rehearsal of the “Artemis II” crewed lunar flyby mission on the 2nd, covering key steps such as propellant loading and launch countdown. However, due to a liquid hydrogen leak at the rocket’s core stage propellant interface, the countdown was halted. NASA Administrator Bill Nelson stated that the mission launch window will be postponed from February to March. (Xinhua)

View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Repost
  • Share
Comment
0/400
No comments
  • Pin

Trade Crypto Anywhere Anytime
qrCode
Scan to download Gate App
Community
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)